Edged Fort Worth Data Center Low-Voltage Watch
Edged Energy Outpost in Fort Worth has a TDLR filing for a 488,770 sq ft data center, $300M estimated cost, MG2 as design firm, and a broader $1.1B two-phase city-agreement context, while specialty low-voltage package names remain open.
Jul 11, 2026
$10B Meta Lebanon AI Data Center in Indiana Needs 10 Low Voltage Systems
Meta's Lebanon, Indiana campus — a $10B, 1 GW AI data center at the state's LEAP district with 10 data centers across 1,500 acres — requires ten low voltage systems with an estimated $400 million in LV work. Electrical prime Faith Technologies is already on site. Here's what low voltage contractors need to know.
Jul 10, 2026
Amazon Project Eagle Boling Data Center Watch
Amazon Project Eagle in Boling, Texas has four TDLR data-center filings totaling about 756,240 square feet and $1.2B in estimated building value, with Gensler named as design firm and specialty package names still open.
Jul 10, 2026
$62.1M Sutter Health Sports Medicine Complex in Sacramento Needs 5 Low Voltage Systems
Permit records show a $62.1M build-out of Sutter Health's new Advanced Orthopedics & Sports Medicine Care Complex at 660 J Street in downtown Sacramento, requiring five low voltage systems including nurse call, clinical AV, and security, with an estimated $3.7M in LV work. Here's what low voltage contractors need to know.
Jul 9, 2026
Meta Sturgeon County AI Data Centre Watch
Meta Sturgeon County is a 1GW Canadian AI data-centre watch with Pembina Greenlight power context and unresolved specialty package names.
Jul 9, 2026
$25B Vantage Frontier AI Data Center in Texas Needs 10 Low Voltage Systems
Vantage Data Centers' Frontier — a $25B, 1.4 GW Oracle-OpenAI Stargate AI data center near Abilene, TX and the largest campus in Vantage's global portfolio — requires ten low voltage systems with an estimated campus-wide LV opportunity approaching $1 billion. Here's what low voltage contractors need to know.
Jul 8, 2026
Galaxy Helios Phase 2 Low-Voltage Watch
Galaxy Helios Phase II has CoreWeave capacity, TDLR filings, Stantec named, and unresolved specialty low-voltage package names.
Jul 8, 2026
$36M Atlanta Botanical Garden Expansion Needs 7 Low Voltage Systems
Permit records show a $36M expansion of the Atlanta Botanical Garden — part of a $160M Beltline-facing capital campaign — requiring seven low voltage systems including AV, security, and building automation, with an estimated $2.5M in LV work. Here's what low voltage contractors need to know.
Jul 7, 2026
TeraWulf Justified Data AI Campus Low-Voltage Watch
TeraWulf's Justified Data campus in Hawesville has a source-backed Anthropic lease, 401 MW critical IT load, and unresolved specialty package names.
Jul 7, 2026
Google Akransas AI Data Center Low-Voltage Watch
Google's West Memphis data center is a source-backed Arkansas AI infrastructure project with Entergy power context and low-voltage package names still unresolved.
Jul 6, 2026
LVN Signal Now Tracks Fresno, California: Real-Time Construction Intelligence for Low Voltage Contractors
Fresno, California is now live on LVN Signal. Low voltage contractors in the Fresno metro now have real-time construction intelligence covering 1,770+ active projects, with 84 new this week — just as Dodge forecasts Fresno construction starts to climb 20% in 2026.
Jul 6, 2026
$10B Meta Hyperion AI Data Center in Louisiana Needs 10 Low Voltage Systems
Meta's Hyperion — its largest data center to date, a $10B, 4 million-square-foot AI campus in Richland Parish, Louisiana — requires ten low voltage systems with an estimated $400 million in LV and structured infrastructure work. Here's what low voltage contractors need to know.
Jul 6, 2026
Airport Security Upgrade: Genetec Unifies 64 Cameras & Access
Southwest Wyoming Regional Airport replaced legacy systems with Genetec Security Center during a $43M modernization—64 cameras, 22 doors, 130+ sensors on one platform.
Jul 6, 2026
Ubiquiti AI Multi Sensor 2: Dual-Lens PoE+ Camera Review
The $699 AI Multi Sensor 2 delivers 16MP dual-lens coverage with PoE+ power. Here's what low voltage contractors need to know about camera count and design.
Jul 6, 2026
Ubiquiti Enterprise Firewall Core: 100G UniFi for Enterprise
The new Enterprise Firewall Core delivers 100 Gbps routing, 79 Gbps IDS/IPS, and 22,500+ client capacity. Here's what LV contractors need to know about UniFi's enterprise push.
Jul 5, 2026